Pakistan Railways Jobs in Lahore 2022 for Stenographer
Pakistan Railways Jobs in Lahore 2022 for Stenographer
In 1855, during the British Raj, a
few rail route organizations started laying track and working in Sindh and
Punjab. The country's rail line framework was initially an interwoven of nearby
rail lines worked by little, privately owned businesses, including the Scinde
Railway, Punjab Railway, Delhi Railway, and Indus Flotilla. In 1870, the four
organizations joined to shape the Scinde, Punjab, and Delhi Railway. A few other
rail lines were before long assembled, including the Indus Valley State
Railway, Punjab Northern State Railway, Sind-Sagar Railway, Sind-Pishin State
Railway, Trans-Baluchistan Railway, and Kandahar State Railway. These six
organizations converged with the Scinde, Punjab, and Delhi Railway to shape the
North Western State Railway in 1880. Somewhere in the range of 1880 and 1947, the
North-Western State Railway extended all through Punjab and Sindh. Trains were
normalized after a report from the Locomotive Committee on Standard Locomotives
for Indian Railways, distributed in 1910.[7]
Following freedom in 1947, the
greater part of the North-Western State Railway foundation was in the Pakistani
domain and was renamed the Pakistan Western Railway. In East Bengal, the piece
of the Assam Bengal Railway in the Pakistani region was renamed the Pakistan
Eastern Railway. The nation embraced 8,122 km (5,047 mi) of the North-Western
State Railway; 6,880 km (4,280 mi) was 1,676 mm (5 ft 6 in), 506 kilometers
(314 mi) was 1,000 mm (3 ft 3+3⁄8 in) meter check, and 736 kilometers (457 mi)
was 762 mm (2 ft 6 in) thin measure.
In 1954, a branch
line was stretched out from the Karachi-Peshawar Railway Line to Mardan and
Charsada. After two years, the Jacobabad-Kashmore meter-measure line was
changed over to a 1,676 mm (5 ft 6 in) expansive check. The Kot Adu-Kashmore
segment of the Kotri-Attock Railway Line was worked from 1969 to 1973, giving a
backup way to go from Karachi to northern Pakistan. In 1974, Pakistan Western
Railways was renamed Pakistan Railways. In February 2006, the 126-kilometer (78
mi) Hyderabad-Khokhrapar Branch Line was changed over to 1,676 mm (5 ft 6 in).
All thin measure tracks in the nation were changed over to 1,676 mm (5 ft 6 in)
or destroyed during the 2000s. On 8 January 2016, the Lodhran-Raiwind Branch Line
twofold rail project was finished.
Detail about the job in Punjab Lahore Pakistan railway 2022
On this page, you can
secure information on the latest enrollment of the Pakistan Railways Government
of Pakistan.
Applicants having
homes of Punjab, Sindh Urban, Sindh Rural, Khyber Pakhtunkhwa, Gilgit Baltistan,
FATA, Balochistan, and AJK can apply for these openings.
As of now,
Pakistan Railways is hoping to recruit staff for its PSDP Project of Special
Repair 100 Diesel Electric Locos/New. The arrangement will be made on a
one-year agreement premise and further extendable till the finish of the
venture under normal terms and conditions.
This task is hoping to recruit a Stenographer. Candidates
holding Graduation least second Division, composing speed 40 wpm, shorthand
speed 100 wpm, a half year declaration in Computer Applications, and 30 years
post capability experience are qualified to fill this post.
Detail
about the job in Lahore Pakistan railway 2022
POSTED ON
|
3RD FEB2022
|
Location
|
LAHORE
|
Education
|
GRADUATION
|
LAST DATE
|
18 FEB 2022
|
VACANCIES
|
01
|
Company
|
Railways
|
ADDRESS
|
Project Director/SR-100 Locos/New DS/W Office
Building, Pakistan Railways, Lahore
|
How to apply for the latest job Pakistan
railway Lahore Punjab 2022
·
physically composed application with complete
information
·
approved copies of educational confirmations,
·
CNIC, Domicile, Certificate of Covid-19 Vaccination
from NADRA
·
two new photographs
·
three envelopes suitably ventured should reach by
eighteenth February 2022.
| Pakistan Railways Jobs in Lahore 2022 for Stenographer |
Comments
Post a Comment